Mor-Gran-Sou's Print Logo
Go to Mor-Gran-Sou's Home PageMor-gran-sou Header
Touchstone Energy LogoMor-gran-sou Header
Home » Cooperative » Service Rules & Regulations » A. Rate Application

A. Rate Application

  1. Selection of Rates – Rate availability is listed in each rate schedule.  The Cooperative will determine which rate schedule is appropriate.  Load changes may dictate a change in rate schedules.
Mor-Gran-Sou Electric Cooperative, Inc. :: Copyright © All Rights Reserved
(701) 663-0297 :: (701) 597-3301 :: 1-800-750-8212
Site Developed in part by Basin Electric Power Cooperative